University of MD Students Tour Bacon Ridge Branch Stream Restoration Project

Late last month, GreenVest and project partner Biohabitats hosted students from the University of Maryland on a tour of our Bacon Ridge Branch Stream Restoration Project. GreenVest’s Senior Project Manager David Merkey and Ecosystem Restoration Specialist Jack Turner led the group on this educational outing. Part of the University’s Department of Environmental Science and Technology, […]

Read More…

An Update on the Muddy Creek Stream Restoration

River Valley Ranch, post restoration

GreenVest wrapped up the third year of maintenance and monitoring of the Muddy Creek (River Valley Ranch) Stream Restoration Project (MCRP) in 2022. This installment provides an update on the continued success of the restoration as we enter Year 4. First, a little background on the project. Streams within the project area are known brook […]

Read More…

Tinkers Creek Stream Restoration Project Recognized with a BUBBA Award

Tinkers Creek Stream, post restoration

GreenVest is proud to announce that the Tinkers Creek Stream Restoration Project for Prince George’s County Department of the Environment (DOE) was honored with second place in the Best Stream Restoration category of the Chesapeake Stormwater Network’s (CSN) Best Urban BMP in the Bay Award contest (BUBBAs). This amazing honor is part of a program […]

Read More…

National Water Quality Month

Tinker's Creek Stream Restoration Project

There are approximately 332.5 million cubic miles (over 365 quintillion gallons) of water on our planet covering about 71% of the globe. That sounds like a lot, but only about 1% is easily accessible freshwater in our rivers, streams, groundwater, and aquifers. That’s not a lot. Because humans use so much water per day for […]

Read More…

Jamesburg Park Restoration – 3 Years Later

Atlantic White Cedar Enhancement Area

The Jamesburg Park Conservation Area is one of GreenVest’s larger Middlesex County Wetland Restoration sites on county-owned parkland in New Jersey. Along with 4 others, this 13.5-acre mitigation site was funded by the New Jersey Freshwater Wetland In-Lieu-Fee program for the Middlesex County Parks Department. Working with project partners GreenTrust Alliance and Princeton Hydro, GreenVest […]

Read More…

Laura Kelm Presents at BeaverCon 2022

BeaverCon 2022 logo

Last month GreenVest Project Manager, Laura Kelm, presented at BeaverCon, a conference about beaver conflict management and watershed restoration. This year’s theme was “Building Climate Resilience: A Nature-Based Approach” which closely reflects GreenVest’s own values. Laura presented with project partner Biohabitat’s Senior Ecologist, Joe Berg, about the beaver at the Bacon Ridge Branch Stream Restoration […]

Read More…

Beavers: Unexpected Partners at Bacon Ridge Branch Stream Restoration Project

Beaver dam on top of log jam

With each new stream restoration project, we employ a variety of techniques to bring the stream and its surrounding ecosystem back to health. For the Bacon Ridge Branch Stream Restoration Project, we used a ‘lighter touch’ approach that leveraged on-site materials to create structures that raised the water surface elevation and reconnected the stream to […]

Read More…

GreenVest’s Laura Kelm Featured on In-Situ Podcast

GreenVest's Laura Kelm Featured on In-Situ's AQUAPOD Podcast

Project Manager, Laura Kelm, was interviewed for In-Situ’s AQUAPOD podcast to talk about her work on restoration and mitigation projects. Take some time to listen to what Laura has to say about her experiences with restoring hydrologic function, reducing sediment and nutrient flow into the Chesapeake Bay, and improving habitat. “It was great to talk […]

Read More…

A Field Trip to the Bacon Ridge Branch Stream Restoration Site

GreenVest Staff on Bridge at Bacon Ridge Branch Stream Restoration Project

Last month, the GreenVest Maryland staff took a field trip to the Bacon Ridge Branch Stream Restoration Project Site at the Elks Camp Barrett in Annapolis. Our team members got to see the completed stream restoration firsthand, while our Operations Staff shared information about the project and what makes it so special. For those that […]

Read More…

Tinkers Creek Stream Restoration Completion

Tinkers Creek Thriving Post Construction

GreenVest, LLC and Petro Design Build Group, under the GV-Petro Joint Venture, LLC, recently completed construction of the Tinkers Creek Stream Restoration Project. The Project is a full-delivery solution for the Prince George’s County Department of the Environment (DOE) to comply with their total maximum daily load (TMDL) and Impervious Acres Treated requirements as part […]

Read More…